AutoCo is a major automotive manufacturer whose large vehicle group is extremely profitable, but customer demand for these vehicles exceeds existing capacity
Plant management determined that XYZ Assembly was the primary obstacle to achieving the engine production necessary for the target number of vehicles
As part of a full potential manufacturing improvement program, the Bain team was charged with
- improving productivity at the bottleneck machine on the main assembly line
- improving the yield of the subassembly department feeding the bottleneck machine
- finding five more engines per hour (JPH) on the XYZ Assembly and on the mainline station it feeds
|